Location: Athol, MA
Value: $385,000
Completion Date: July 2004
Description: Kodiak completed the bridge replacement for the roadway over the spillway from White Pond. TEC prepared the designs for temporary support of excavation, control of water and erection procedures. The replacement bridge utilized a precast CON/SPAN system.